Schedules: 2010 2011 2012 2013 2014 2015
| Week | Month | Date | Sun | Mon | Tues. | Wed. | Thurs. | Fri. | Sat. | |||
2014
| 1 | Jan. |
|
|
|
|
|
|
|
| |||
| 5 | Maintenance: Tandem, Linac, Cryogenics | |||||||||||
| 12 | Tandem projects: 3He-source, install cross-connection bars | |||||||||||
4 |
| 19 | Linac: Pull and clean Cryostat C | ||||||||||
| 26 | Reconfigure Resolut BL | NSF site-visit |
| |||||||||
Feb. | 2 |
| |||||||||||
7 |
| 9 |
| ||||||||||
| 16 | Cryogenics: Rebuild new 1630 | R. de Souza, Indiana Univ. | ||||||||||
9 |
| 23 | 18O(12C,x) fusion experiment, Tandem only | ||||||||||
Mar. | 2 | Quadrupole alignment test, Tandem conditioning | |||||||||||
| 9 | J. Blackmon (LSU) Ion chamber test 12C beam, Tandem only |
| ||||||||||
| 16 | I. Wiedenhöver, RESONEUT 12C(d,n)13N test |
| ||||||||||
| 23 | K. Kemper, 14N(3He,d)15O, Tandem only |
| ||||||||||
| 30 | I. Wiedenhöver, RESONEUT 12C(d,n)13N test |
|
| |||||||||
Apr. | 6 |
| K.K, p |
| Tandem |
|
|
| |||||
| 13 | Linac conditioning, Re-buncher installation | |||||||||||
| 20 | 12C(d,n) test runs, conditioning of Linac | |||||||||||
| 27 | Linac vacuum failure in Cryostat B, warm up Cryostat B and C | |||||||||||
May | 4 | Repair vacuum problem, cable on C3 resonator | |||||||||||
| 11 | 12C(d,n), 16O(d,n) test runs, I. Wiedenhöver, RESONEUT | |||||||||||
| 18 | 17F(d,n)18Ne Tandem-Linac-Resolut RESOLUT Resoneut+NaI+Si+IC detector | |||||||||||
22 |
| 25 | |||||||||||
June | 1 |
|
| ||||||||||
| 8 | beam 24Mg, 25Al devel | Wiedenhoever 25Al(d,n) | ||||||||||
| 15 | RESOLUT NaI+Si+IC | Blackmon et al. | ||||||||||
| 22 | SI+IC 25Al (p,p) | |||||||||||
27 |
| 29 |
| Install 14C ion-source | |||||||||
July | 6 | B. Kay (Wesleyan College) 14C, 50 MeV, gamma-array | |||||||||||
29 |
| 13 |
| P. Cottle, 14C 68 MeV gamma-array | |||||||||
30 |
| 20 |
| Tripathi 14C 68 MeV gamma | |||||||||
31 |
| 27 |
| ||||||||||
32 | Aug. | 3 | Install SNICS source, Maintenance, Install RESOLUT FP chamber | ||||||||||
| 10 | Develop Flourine beam, Maintenance | Wiedenhoever | ||||||||||
| 17 | RESOLUT 19Ne(d,n)20Na NaI+Si+IC | |||||||||||
| 24 |
| Install Detectors, Devel 3He | ||||||||||
| 31 | G. Kiss (Atomki) M. La Cognata (Catania) 3He + 6Li | |||||||||||
Sep | 7 | In 0-degree scattering chamber | |||||||||||
| 14 | Extended shutdown:
| |||||||||||
| 21 | ||||||||||||
| 28 | ||||||||||||
41 | Oct | 5 | |||||||||||
| 12 | ||||||||||||
| 19 | ||||||||||||
| 26 | ||||||||||||
45 | Nov | 2 | |||||||||||
46 |
| 9 | |||||||||||
| 16 | ||||||||||||
| 23 | ||||||||||||
| 30 | ||||||||||||
Dec | 7 | Rijal, Baby, Wiedenhoever: 7Li, 20 MeV ANASEN in target room 1: | |||||||||||
| 14 | ||||||||||||
52 |
| 21 | 6Li Beam test in TR1 Fletcher-chamber |
|
|
|