Schedules: 2010 2011 2012 2013 2014 2015

 

Week
meeting

Month

Date

Sun

Mon

Tues.

Wed.

Thurs.

Fri.

Sat.

2014

 

1

Jan.

 

 

 

 

 

 

 

 

2

 

5

Maintenance: Tandem, Linac, Cryogenics

3

 

12

Tandem projects: 3He-source, install cross-connection bars

4

 

19

Linac: Pull and clean Cryostat C

5

 

26

Reconfigure Resolut BL

NSF site-visit

 

6

Feb.

2

 

7

 

9

 

8

 

16

Cryogenics: Rebuild new 1630

R. de Souza, Indiana Univ.

9

 

23

18O(12C,x) fusion experiment, Tandem only

10

Mar.

2

Quadrupole alignment test, Tandem conditioning

11

 

9

J. Blackmon (LSU) Ion chamber test 12C beam, Tandem only

 

12

 

16

I. Wiedenhöver, RESONEUT 12C(d,n)13N test

 

13

 

23

K. Kemper, 14N(3He,d)15O, Tandem only

 

14

 

30

I. Wiedenhöver, RESONEUT 12C(d,n)13N test

 

 

15

Apr.

6

 

K.K, p

 

Tandem
E-calib.

 

 

 

16

 

13

Linac conditioning, Re-buncher installation

17

 

20

12C(d,n) test runs, conditioning of Linac

18

 

27

Linac vacuum failure in Cryostat B, warm up Cryostat B and C

19

May

4

Repair vacuum problem, cable on C3 resonator

20

 

11

12C(d,n), 16O(d,n) test runs,  I. Wiedenhöver, RESONEUT

21

 

18

17F(d,n)18Ne Tandem-Linac-Resolut

RESOLUT Resoneut+NaI+Si+IC detector

22

 

25

23

June

1

 

 

24

 

8

beam  24Mg, 25Al devel

Wiedenhoever 25Al(d,n)  

25

 

15

RESOLUT NaI+Si+IC

Blackmon et al.

26

 

22

SI+IC 25Al (p,p)

27

 

29

 

Install 14C ion-source

28

July

6

B. Kay (Wesleyan College) 14C, 50 MeV, gamma-array

29

 

13

 

P. Cottle, 14C  68 MeV gamma-array

30

 

20

 

Tripathi 14C 68 MeV gamma

31

 

27

 

32

Aug.

3

Install SNICS source, Maintenance, Install RESOLUT FP chamber

33

 

10

Develop Flourine beam, Maintenance

Wiedenhoever

34

 

17

RESOLUT 19Ne(d,n)20Na NaI+Si+IC

35

 

24

 

Install Detectors, Devel 3He

36

 

31

G. Kiss (Atomki) M. La Cognata (Catania) 3He + 6Li

37

Sep

7

In 0-degree scattering chamber

38

 

14

Extended shutdown:
Tasks :

  • Linac Cryostat B maintenance / cleaning  

  • update Tandem vacuum-instrumentation and interlock 

  • install “new design” column bridges on HE side  

  • improve Tandem transmission : Increase HE cup1 diameter 

  • create alignment marks for beam lines in TR1 

  • re-install power to Quadrupole doublets , analyzing and switching magnet in target room 1  

  • install and commission high-pressure resonator clean facility 

  • improve Linac -PDP power supplies, develop and install the “local” supply modules 

39

 

21

40

 

28

41

Oct

5

42

 

12

43

 

19

44

 

26

45

Nov

2

46

 

9

47

 

16

48

 

23

49

 

30

50

Dec

7

Rijal, Baby, Wiedenhoever:  7Li, 20 MeV ANASEN in target room 1:
7Li(d,n)  experiment

51

 

14

52

 

21

6Li Beam test in TR1 Fletcher-chamber