LINAC: Difference between revisions
Jump to navigation
Jump to search
(Created page with "= Power Outage Procedure = = Helium Refrigerator Restart Procedure = = Super Fast Valve Reset Procedure = = Troubleshooting Linac out of Lock Problems = = 5.5 Troubleshooting Loss of Beam Phase Lock = = 5.6 Bunching System: Buncher and Chopper = == 5.6.1 Setting Chopper PHASE == == 5.6.2 Check the L.E. Buncher Field Level == == 5.6.3 Check Chopper Phase Lock == == 5.6.4 Adjustment of Chopper Amplitude == = 5.7 Resonator Lock Status = == 5.7.1 Checking the P...") |
No edit summary |
||
Line 1: | Line 1: | ||
<span style="color:red">'''NEED PROOF READING</span> | |||
= Power Outage Procedure = | = Power Outage Procedure = | ||
Revision as of 15:24, 11 April 2022
NEED PROOF READING