User contributions for Pbarber
Jump to navigation
Jump to search
26 May 2023
- 15:5515:55, 26 May 2023 diff hist +102 N File:Sps x fsu tgt frame.pdf PDF drawing of the adapter frame for mounting small FSU targets on the SPS target ladder current
24 March 2023
- 10:3510:35, 24 March 2023 diff hist −2 m Laboratory Infrastructure No edit summary current
- 10:3410:34, 24 March 2023 diff hist +4 FSU Fox's Lab Wiki No edit summary Tag: Manual revert
- 10:3410:34, 24 March 2023 diff hist +39 N Laboratory Facilities Pbarber moved page Laboratory Facilities to Laboratory Infrastructure current Tag: New redirect
- 10:3410:34, 24 March 2023 diff hist 0 m Laboratory Infrastructure Pbarber moved page Laboratory Facilities to Laboratory Infrastructure
- 10:3310:33, 24 March 2023 diff hist −4 FSU Fox's Lab Wiki No edit summary Tags: Manual revert Reverted
- 10:3210:32, 24 March 2023 diff hist +4 FSU Fox's Lab Wiki No edit summary Tag: Reverted
- 10:2210:22, 24 March 2023 diff hist +87 N Internal:Annual Crane Inspections Created page with "thumb|2023 MAR Crane Inspection Report"
- 10:2110:21, 24 March 2023 diff hist +71 N File:2023 MAR 23 crane inspection report.pdf No edit summary current
- 10:1810:18, 24 March 2023 diff hist +39 Laboratory Infrastructure No edit summary
- 10:1710:17, 24 March 2023 diff hist +230 N Laboratory Infrastructure Created page with "== Rigging and Lifting Equipment == == Compressed Air Systems == == Tandem Chill Water System == == Scientific Cooling Water (well water) Systems == == RESOLUTE Chill Water System == == SPS Magnet Cooling Water System =="
- 10:1110:11, 24 March 2023 diff hist +29 FSU Fox's Lab Wiki No edit summary
28 February 2023
- 13:1113:11, 28 February 2023 diff hist +63 Talk:Weekly Tandem Maintenance No edit summary current
- 13:1013:10, 28 February 2023 diff hist +244 N Talk:Weekly Tandem Maintenance Created page with "* Students are no longer required to check cryopump compressor hours meters. * TR1 Switching magnet no longer has a cryopump. * Added item to have students check operation of air compressor room exhaust fan to ensure 110VAC breaker not tripped."
- 13:0513:05, 28 February 2023 diff hist 0 Weekly Tandem Maintenance No edit summary
- 13:0313:03, 28 February 2023 diff hist −332 Weekly Tandem Maintenance No edit summary
12 January 2023
- 17:0617:06, 12 January 2023 diff hist +4 m Target Lab →NOTICE
- 14:3214:32, 12 January 2023 diff hist +20 m Target Lab →Target Frames
9 December 2022
- 10:2410:24, 9 December 2022 diff hist +39 m Target Chamber Swaps No edit summary current
8 December 2022
- 13:5813:58, 8 December 2022 diff hist −2 m Target Chamber Swaps No edit summary
- 13:0813:08, 8 December 2022 diff hist +154 Split-Pole Spectrograph →SPS Operating Procedures
- 13:0613:06, 8 December 2022 diff hist −102 m Target Chamber Swaps No edit summary
- 12:5912:59, 8 December 2022 diff hist +29 m Target Chamber Swaps No edit summary
- 12:3512:35, 8 December 2022 diff hist +13 m Target Chamber Swaps No edit summary
- 12:2012:20, 8 December 2022 diff hist −29 m Target Chamber Swaps No edit summary
- 12:2012:20, 8 December 2022 diff hist −1 m Split-Pole Spectrograph →SPS Operation Procedures
- 12:1912:19, 8 December 2022 diff hist +2 m Split-Pole Spectrograph No edit summary
- 12:1212:12, 8 December 2022 diff hist +1,947 N Target Chamber Swaps Created page with "During the recent switch from the Spieker chamber to the original Yale chamber, there was some basic confusion about how to re-install the Yale chamber. Most involved agreed that it would be useful to develop a checklist for chamber swaps. I offer the following notes as a starting place for this and other procedures associated w/ the SPS. == Target Chamber Swaps == === Spieker Chamber -> Yale Chamber === The following notes are lessons learned (or more accurately re-l..."
- 11:5211:52, 8 December 2022 diff hist +58 Split-Pole Spectrograph No edit summary
26 October 2022
- 15:0215:02, 26 October 2022 diff hist −10 m Target Lab No edit summary
21 October 2022
- 09:2609:26, 21 October 2022 diff hist +680 m Standard Laboratory Vacuum System Stations No edit summary
20 September 2022
- 12:3912:39, 20 September 2022 diff hist 0 File:External 2nd stripper frame.pdf Pbarber uploaded a new version of File:External 2nd stripper frame.pdf current
- 10:3910:39, 20 September 2022 diff hist +70 Target Lab →Target Frames
- 10:3810:38, 20 September 2022 diff hist 0 N File:External 2nd stripper frame.pdf No edit summary
19 September 2022
- 09:3809:38, 19 September 2022 diff hist +15 m Target Lab →Carbon
16 September 2022
- 11:0411:04, 16 September 2022 diff hist −85 m Target Lab No edit summary
- 10:5410:54, 16 September 2022 diff hist −5 m Target Lab →CD2 Targets
- 10:5210:52, 16 September 2022 diff hist +26 m Target Lab No edit summary
- 09:4109:41, 16 September 2022 diff hist +217 m Target Lab No edit summary
15 September 2022
- 20:2020:20, 15 September 2022 diff hist +61 Target Lab No edit summary
- 20:1720:17, 15 September 2022 diff hist +57 m Target Lab No edit summary
- 20:1620:16, 15 September 2022 diff hist +73 Target Lab No edit summary
- 20:1420:14, 15 September 2022 diff hist 0 N File:Stripper foil frame.pdf No edit summary current
- 20:0820:08, 15 September 2022 diff hist +1,978 Target Lab No edit summary
- 19:2319:23, 15 September 2022 diff hist −4 m Target Lab No edit summary
- 19:1919:19, 15 September 2022 diff hist +327 m Target Lab No edit summary
- 19:0919:09, 15 September 2022 diff hist −12 m Target Lab No edit summary
- 19:0619:06, 15 September 2022 diff hist +1 Target Lab No edit summary
- 19:0519:05, 15 September 2022 diff hist +1,744 Target Lab No edit summary
- 18:2918:29, 15 September 2022 diff hist −17 Target Lab No edit summary