1

Jan.

 

 

 

 

 

 

 

 

2

 

4

W. Boeglin (FIU): p, 4 MeV scattering for Fusion experiment detector

3

 

11

A. Washington (Savannah River): 4He, 5.5 MeV materials irradiation

4

 

18

K. Kemper: 6Li, 3He, for 14N(d,3He) in Fletcher chamber

5

 

25

Buncher test into TR1

6

Feb.

1

 

 

Rijal / IW 7Li, 6 MeV in ANASEN, TR1 / R22

7

 

8

 

 

 

 

 

 

 

8

 

15

R. de Souza (IU): 18O+12C fusion cross section (Tandem only)

9

 

22

in Linac-hall L7

move setup from  L7 to RESOLUT

10

Mar.

1

 

Tabor 18O / Gamma

 

 

 

 

11

 

8

R. de Souza (IU): 19O+12C fusion cross section RESOLUT-run

12

 

15

Interrupt run for LINAC repair, Pull Tank D, Install Tank B

13

 

22

continued...

14

 

29

 

15

Apr.

5

 

J. Nolen / L22 Solid Catcher 4He, 15 MeV

16

 

12

Dungan /Tabor 14C 30 MeV

17

 

19

 

18

 

26

Abromeit /Tabor 14C 30 MeV

19

May

3

Kemper / Cottle 14C 68 MeV

Barron / Riley

20

 

10

Barron / Riley 14C 75 MeV

Villafana / Riley 14C 75 MeV

21

 

17

cont.

Moving of the Neutron-wall / construction of clean room

22

 

24

Parker / Wiedenhoever 3He 6.5 MeV

23

 

31

J. Nolen / L22 Solid Catcher 4He, 15 MeV

24

June

7

Resolut beam development 18O

25

 

14

R. de Souza (IU): 19O+12C fusion cross section RESOLUT-run

26

 

21

cont'd

27

 

28

V. Tripathi : 17F + 12C

28

July

5

Pre-accelerator HV / source maintenance

29

 

12

A. Washington (Savannah River): 4He, 5.5 MeV materials irradiation

30

 

19

Rijal / Wiedenhoever 7Li 6 MeV ANASEN, TR1 L22

31

 

26

Preparation for EBSS / (d,p) test, irradiation Beams p,d 16 MeV

32

Aug.

2

Exotic Beam Summer School 2015 !!!

33

 

9

Rijal / Wiedenhoever 7Li 6 MeV ANASEN, TR1 L22

34

 

16

A. Washington (Savannah River): 4He, 5.5 MeV materials irradiation

35

 

23

Maintenance Shutdown

Tandem: Stripper foil change, LE injection optics modification
Corona-probe modification for low-energy acceleration Vterm < 2 MV

Linac: rebuild Cryostat C RF and low-V cables, VCX-units

36

 

30

37

Sep

6

38

 

13

39

 

20

 

 

 

J. Nolen: 0 degree solid ion catcher

40

 

27

 

 

d-beam 16 MeV 25Mg(d,p)  Austin, Wiedenhoever

41

Oct

4

Fletcher-Chamber:  12C(d,p) Skeeters, Kemper

42

 

11

Linac Cooldown

43

 

18

Linac cooldown, Linac conditioning, install new preaccelerator supply

44

 

25

Tandem-bunching tests, Anasen propotional counter installation

45

Nov

1

 

p-beam into ANASEN

46

 

8

p beam in ANASEN, calibration, test

Anasen 7Li beam

47

 

15

ANASEN 7Li(d,p)2α

6Li(d,n)7Be dev

48

 

22

7Li(p,n)7Be in RESOLUT, Riljal, Wiedenhoever: 7Be(d,p)2α in ANASEN

49

 

29

7Be(d,p)2α in ANASEN

50

Dec

6

Tandem breakdown: LE Pelletron chain failure

51

 

13

Tandem: Attempt to fix LE chain, breaks immediately, again

52

 

20

Holiday break

53

 

27