Schedules: 2010 2011 2012 2013 2014 2015
2015 | Week | Month | Date | Sun | Mon | Tues. | Wed. | Thurs. | Fri. | Sat. | ||
| 1 | Jan. |
|
|
|
|
|
|
|
| ||
| 4 | W. Boeglin (FIU): p, 4 MeV scattering for Fusion experiment detector | ||||||||||
3 |
| 11 | A. Washington (Savannah River): 4He, 5.5 MeV materials irradiation | |||||||||
4 |
| 18 | K. Kemper: 6Li, 3He, for 14N(d,3He) in Fletcher chamber | |||||||||
5 |
| 25 | Buncher test into TR1 | |||||||||
6 | Feb. | 1 |
|
| Rijal / IW 7Li, 6 MeV in ANASEN, TR1 / R22 | |||||||
7 |
| 8 |
|
|
|
|
|
|
| |||
8 |
| 15 | R. de Souza (IU): 18O+12C fusion cross section (Tandem only) | |||||||||
9 |
| 22 | in Linac-hall L7 | move setup from L7 to RESOLUT | ||||||||
10 | Mar. | 1 |
| Tabor 18O / Gamma |
|
|
|
| ||||
11 |
| 8 | R. de Souza (IU): 19O+12C fusion cross section RESOLUT-run | |||||||||
12 |
| 15 | Interrupt run for LINAC repair, Pull Tank D, Install Tank B | |||||||||
13 |
| 22 | continued... | |||||||||
14 |
| 29 |
| |||||||||
15 | Apr. | 5 |
| J. Nolen / L22 Solid Catcher 4He, 15 MeV | ||||||||
16 |
| 12 | Dungan /Tabor 14C 30 MeV | |||||||||
17 |
| 19 |
| |||||||||
18 |
| 26 | Abromeit /Tabor 14C 30 MeV | |||||||||
19 | May | 3 | Kemper / Cottle 14C 68 MeV | Barron / Riley | ||||||||
20 |
| 10 | Barron / Riley 14C 75 MeV | Villafana / Riley 14C 75 MeV | ||||||||
21 |
| 17 | cont. | Moving of the Neutron-wall / construction of clean room | ||||||||
22 |
| 24 | Parker / Wiedenhoever 3He 6.5 MeV | |||||||||
23 |
| 31 | J. Nolen / L22 Solid Catcher 4He, 15 MeV | |||||||||
24 | June | 7 | Resolut beam development 18O | |||||||||
25 |
| 14 | R. de Souza (IU): 19O+12C fusion cross section RESOLUT-run | |||||||||
26 |
| 21 | cont'd | |||||||||
27 |
| 28 | V. Tripathi : 17F + 12C | |||||||||
28 | July | 5 | Pre-accelerator HV / source maintenance | |||||||||
29 |
| 12 | A. Washington (Savannah River): 4He, 5.5 MeV materials irradiation | |||||||||
30 |
| 19 | Rijal / Wiedenhoever 7Li 6 MeV ANASEN, TR1 L22 | |||||||||
31 |
| 26 | Preparation for EBSS / (d,p) test, irradiation Beams p,d 16 MeV | |||||||||
32 | Aug. | 2 | Exotic Beam Summer School 2015 !!! | |||||||||
33 |
| 9 | Rijal / Wiedenhoever 7Li 6 MeV ANASEN, TR1 L22 | |||||||||
34 |
| 16 | A. Washington (Savannah River): 4He, 5.5 MeV materials irradiation | |||||||||
35 |
| 23 | Maintenance Shutdown Tandem: Stripper foil change, LE injection optics modification Linac: rebuild Cryostat C RF and low-V cables, VCX-units | |||||||||
36 |
| 30 | ||||||||||
37 | Sep | 6 | ||||||||||
38 |
| 13 | ||||||||||
39 |
| 20 |
|
|
| J. Nolen: 0 degree solid ion catcher | ||||||
40 |
| 27 |
|
| d-beam 16 MeV 25Mg(d,p) Austin, Wiedenhoever | |||||||
41 | Oct | 4 | Fletcher-Chamber: 12C(d,p) Skeeters, Kemper | |||||||||
42 |
| 11 | Linac Cooldown | |||||||||
43 |
| 18 | Linac cooldown, Linac conditioning, install new preaccelerator supply | |||||||||
44 |
| 25 | Tandem-bunching tests, Anasen propotional counter installation | |||||||||
45 | Nov | 1 |
| p-beam into ANASEN | ||||||||
46 |
| 8 | p beam in ANASEN, calibration, test | Anasen 7Li beam | ||||||||
47 |
| 15 | ANASEN 7Li(d,p)2α | 6Li(d,n)7Be dev | ||||||||
48 |
| 22 | 7Li(p,n)7Be in RESOLUT, Riljal, Wiedenhoever: 7Be(d,p)2α in ANASEN | |||||||||
49 |
| 29 | 7Be(d,p)2α in ANASEN | |||||||||
50 | Dec | 6 | Tandem breakdown: LE Pelletron chain failure | |||||||||
51 |
| 13 | Tandem: Attempt to fix LE chain, breaks immediately, again | |||||||||
52 |
| 20 | Holiday break | |||||||||
53 |
| 27 |