User contributions for Pbarber
Jump to navigation
Jump to search
31 May 2023
- 12:0712:07, 31 May 2023 diff hist +109 N File:FV func blk diag.jpeg Functional block diagram of the Tandem Fast Valve system showing VCP placement and orientation. current
- 09:0909:09, 31 May 2023 diff hist +6 m Tandem Beamline Isolation (Fast Valve) System No edit summary
- 09:0609:06, 31 May 2023 diff hist −11 Vacuum Systems No edit summary current
- 08:5708:57, 31 May 2023 diff hist +690 N Tandem Beamline Isolation (Fast Valve) System Created page with "= Introduction = The Tandem Beamline Isolation System, historically referred to as the Fast Valve System, is now a PLC controlled vacuum valve interlock system. It is designed to quickly respond to vacuum failures by isolating the accelerator beamline sections and preventing the failure from propagating further. This system also interlocks with the Pelletron to shut down operation when vacuum faults are detected in the vacuum proximal to the accelerator tubes. Each o..."
- 08:4208:42, 31 May 2023 diff hist +136 Vacuum Systems No edit summary
- 08:4108:41, 31 May 2023 diff hist +7 Vacuum Systems No edit summary
- 08:4008:40, 31 May 2023 diff hist +68 N Vacuum Systems Created page with "= Vacuum Systems = * Standard Laboratory Vacuum System Stations"
- 08:3708:37, 31 May 2023 diff hist 0 m Standard Laboratory Vacuum System Stations Pbarber moved page Vacuum Systems to Standard Laboratory Vacuum System Stations without leaving a redirect: Restructuring subject matter pages.
30 May 2023
- 15:2715:27, 30 May 2023 diff hist +6 m Standard Laboratory Vacuum System Stations →Diffusion Pump Based Stations (rare)
26 May 2023
- 15:4215:42, 26 May 2023 diff hist +8 m Target Lab →Target Frames
- 14:5914:59, 26 May 2023 diff hist +9 m Target Lab →Target Frames
- 14:5814:58, 26 May 2023 diff hist +153 Target Lab →Target Frames
- 14:5614:56, 26 May 2023 diff hist +94 N File:Clarion tgt frame.pdf drawing provided by Mitch Allmond of the target frame used for the CLARION array current
- 14:5514:55, 26 May 2023 diff hist +102 N File:Sps x fsu tgt frame.pdf PDF drawing of the adapter frame for mounting small FSU targets on the SPS target ladder current
24 March 2023
- 09:3509:35, 24 March 2023 diff hist −2 m Laboratory Infrastructure No edit summary current
- 09:3409:34, 24 March 2023 diff hist +4 FSU Fox's Lab Wiki No edit summary Tag: Manual revert
- 09:3409:34, 24 March 2023 diff hist +39 N Laboratory Facilities Pbarber moved page Laboratory Facilities to Laboratory Infrastructure current Tag: New redirect
- 09:3409:34, 24 March 2023 diff hist 0 m Laboratory Infrastructure Pbarber moved page Laboratory Facilities to Laboratory Infrastructure
- 09:3309:33, 24 March 2023 diff hist −4 FSU Fox's Lab Wiki No edit summary Tags: Manual revert Reverted
- 09:3209:32, 24 March 2023 diff hist +4 FSU Fox's Lab Wiki No edit summary Tag: Reverted
- 09:2209:22, 24 March 2023 diff hist +87 N Internal:Annual Crane Inspections Created page with "thumb|2023 MAR Crane Inspection Report"
- 09:2109:21, 24 March 2023 diff hist +71 N File:2023 MAR 23 crane inspection report.pdf No edit summary current
- 09:1809:18, 24 March 2023 diff hist +39 Laboratory Infrastructure No edit summary
- 09:1709:17, 24 March 2023 diff hist +230 N Laboratory Infrastructure Created page with "== Rigging and Lifting Equipment == == Compressed Air Systems == == Tandem Chill Water System == == Scientific Cooling Water (well water) Systems == == RESOLUTE Chill Water System == == SPS Magnet Cooling Water System =="
- 09:1109:11, 24 March 2023 diff hist +29 FSU Fox's Lab Wiki No edit summary
28 February 2023
- 12:1112:11, 28 February 2023 diff hist +63 Talk:Weekly Tandem Maintenance No edit summary current
- 12:1012:10, 28 February 2023 diff hist +244 N Talk:Weekly Tandem Maintenance Created page with "* Students are no longer required to check cryopump compressor hours meters. * TR1 Switching magnet no longer has a cryopump. * Added item to have students check operation of air compressor room exhaust fan to ensure 110VAC breaker not tripped."
- 12:0512:05, 28 February 2023 diff hist 0 Weekly Tandem Maintenance No edit summary
- 12:0312:03, 28 February 2023 diff hist −332 Weekly Tandem Maintenance No edit summary
12 January 2023
- 16:0616:06, 12 January 2023 diff hist +4 m Target Lab →NOTICE
- 13:3213:32, 12 January 2023 diff hist +20 m Target Lab →Target Frames
9 December 2022
- 09:2409:24, 9 December 2022 diff hist +39 m Target Chamber Swaps No edit summary current
8 December 2022
- 12:5812:58, 8 December 2022 diff hist −2 m Target Chamber Swaps No edit summary
- 12:0812:08, 8 December 2022 diff hist +154 Split-Pole Spectrograph →SPS Operating Procedures
- 12:0612:06, 8 December 2022 diff hist −102 m Target Chamber Swaps No edit summary
- 11:5911:59, 8 December 2022 diff hist +29 m Target Chamber Swaps No edit summary
- 11:3511:35, 8 December 2022 diff hist +13 m Target Chamber Swaps No edit summary
- 11:2011:20, 8 December 2022 diff hist −29 m Target Chamber Swaps No edit summary
- 11:2011:20, 8 December 2022 diff hist −1 m Split-Pole Spectrograph →SPS Operation Procedures
- 11:1911:19, 8 December 2022 diff hist +2 m Split-Pole Spectrograph No edit summary
- 11:1211:12, 8 December 2022 diff hist +1,947 N Target Chamber Swaps Created page with "During the recent switch from the Spieker chamber to the original Yale chamber, there was some basic confusion about how to re-install the Yale chamber. Most involved agreed that it would be useful to develop a checklist for chamber swaps. I offer the following notes as a starting place for this and other procedures associated w/ the SPS. == Target Chamber Swaps == === Spieker Chamber -> Yale Chamber === The following notes are lessons learned (or more accurately re-l..."
- 10:5210:52, 8 December 2022 diff hist +58 Split-Pole Spectrograph No edit summary
26 October 2022
- 14:0214:02, 26 October 2022 diff hist −10 m Target Lab No edit summary
21 October 2022
- 08:2608:26, 21 October 2022 diff hist +680 m Standard Laboratory Vacuum System Stations No edit summary
20 September 2022
- 11:3911:39, 20 September 2022 diff hist 0 File:External 2nd stripper frame.pdf Pbarber uploaded a new version of File:External 2nd stripper frame.pdf current
- 09:3909:39, 20 September 2022 diff hist +70 Target Lab →Target Frames
- 09:3809:38, 20 September 2022 diff hist 0 N File:External 2nd stripper frame.pdf No edit summary
19 September 2022
- 08:3808:38, 19 September 2022 diff hist +15 m Target Lab →Carbon
16 September 2022
- 10:0410:04, 16 September 2022 diff hist −85 m Target Lab No edit summary
- 09:5409:54, 16 September 2022 diff hist −5 m Target Lab →CD2 Targets